Consultants: Magma Engineering & Consulting

Project Type: Hospital

Status: Completed

Location: Mansourieh, Lebanon

Area (sqm): 30,000

Project details & specs:

The project involved supply & construction of 220 Bed Medical Center that consists of Three Basements, One Ground Floor & Three Upper Floors

HVAC & BMS

The Air-conditioning installation for this project is based on four pipe system provided from park of Chillers & Fuel Boilers.

Air Distribution Equipment consists of AHU’s, package unit & fan coil units. Ventilation Equipment Consists of seventy nine exhaust & fresh air fan.

All Equipments are provided with HEPA Filters.

The Air Conditioning System is monitored, controlled and managed by the state of the art DDC (Direct Digital Control) system, BMS (Building Management System) & RMS (Room Management System). These manage and control the temperature & lighting operation in the various rooms and related operation of the HVAC equipment.

The project is equipped with fire detection and protection systems. The fire protection
is provided by a wet system, FM 200 & CO2 systems. It needs to be noted that the medical center is fully sprinkled.

MECHANICAL WORK

The Plumbing & Drainage installations for this project are massive and extensive. This includes the installation of all plumbing fixtures inside toilets & kitchens.

The Water Supply system is provided by Underground Concrete Tanks for Raw Water, Water Treatment Plant & Treated Water Tank with at Basement Level. The Water istribution is assured by booster pumps equipped with variable frequency drives.

The hot water is generated in three hot water storage tanks of 3000 L each. RO (Reverse Osmosis) & UV (Ultraviolet), 0 PPM & 30 PPM Softeners are used for water treatment, filtration & disinfection.

The Steam System for this project is provided by central steam Horizontal Firetube Packaged Steel Boiler manufactured by YORK –SHIPLEY including Blow Down Separator, Boiler Feed Water Unit, Steam & Condensate Network, Water Network, Drain Network, Boiler Feedwater Lines, Vent Lines, Relief Lines & Chimney.

The Medical Gas System for this Project includes supply, installation, testing & commissioning of the medical gas network system. This includes Medical Air Plant, Surgical Air Plant, Medical Vacuum Plant, AGSS Plant, Piping Network, Wall Mounted Terminal Units, Area Alarm Panels, AVSU, Ceiling Pendent System, Medical Air Manifold, Nitrous Oxide Manifold and Oxygen Manifold.

Bellevue Medical Center – Hospital
Date

December 20, 2007

Category

BMS, HVAC