
Kokoplast Factory
Client
Saro Dechmekinian
Service
MEP
Value
$600,000
Duration
7 months
This project involved the execution of complete MEP works for the Kokoplast factory, including plumbing systems, ventilation systems, fire fighting infrastructure, and specialized piping networks serving the molding machines and production areas. The scope also included electrical power distribution systems, low current systems, MDB and SMDB panel boards, grounding systems, and fire alarm integration to support the operational and safety requirements of the facility. Mechanical works included ventilation and exhaust systems designed to support industrial production environments and maintain proper operational conditions throughout the factory, based on recognized international engineering standards. The project was executed with a strong focus on optimizing operational performance and reliability across all installed systems.
Scope of Work
- MEP Engineering
- Plumbing Systems
- Ventilation Systems
- Fire Fighting
- Electrical Works
