Consultants: Pierre Dammous & Partners

Project Type: Hotel

Status: Completed

Location: Beirut, Lebanon

Area (sqm): 21,600

Introduction:

With over 60 years of expertise, Hotel Le Bristol combines modern comfort with personalized service. Classically elegant and luxurious, Le Bristol is the epitome of timeless refinement and Lebanese hospitality.
A long-established favorite in Beirut and the region, Le Bristol is a truly Five Star hotel experience, offering international standards of service with an individualized touch.

Innovative and always evolving.

Project details & specs:

The project involved supply & construction of Two Basements, One Ground Floor, One Mezzanine & Six Upper Floor, each upper floor consisting of Thirty Five Rooms
The Ground Floor contains the Hotel Entrance & Lobby, Restaurants, Satellite
Kitchens & Halls

The Basement One contains the main kitchen, Convention Room, Staff Lockers,
Staff Canteen, Garbage Room & Technical Areas

The Basement Two Contains Satellite Kitchen & Technical Areas

The Upper Roof Contains the Chilled Water Plant, Package Units of F6 Floor, Exhaust Fans, Fire Pumps, Cooling Tower & Miscellaneous Equipment.

Mechanical Work

The Air-conditioning installations for this project is based on four pipe system.
Refrigeration Capacity of 2000 KW is provided from a park of six chillers & seven
VRV systems. Eight Pumps are used for chilled water circulation (Five Primary
Pumps & Three Secondary equipped with VFD). Air Handling Equipment consists
of twenty AHU, four package unit & two hundred thirty eight fan coil units. Ventilation Equipment Consists of seventy nine exhaust & fresh air fan.
Heating Plant Capacity of 1400 KW is provided from a park of two boilers & six
pumps for heating water circulation

The Air Conditioning System is monitored, controlled and managed by the a state of the art DDC (Direct Digital Control) system, BMS (Building Management System) & RMS (Room Management System). These manage and control the temperature & lighting operation in the various rooms and related operation of the HVAC equipment

The project is equipped with fire detection and protection systems. The fire protection is provided by a wet system, FM 200 & CO2 systems

The Air Conditioning System is monitored, controlled and managed by a state of the art:

  • DDC (Direct Digital Control) system
  • BMS (Building Management System)
  • RMS (Room Management System)

Implemented to manage and control the temperature & lighting operation in the various rooms and related operation of the HVAC equipment

Plumbing

The Plumbing & Drainage installations for this project is massive and extensive.
It includes the installation of all plumbing fixtures inside toilets & kitchens.

The Water Supply system is provided by Underground Concrete Tanks for Raw Water,
Water Treatment Plant & Treated Water GRP Tank with 35,000 L volume located at Basement 1 Level (Auxiliary Tank is available at Roof as back-up) .

The Water distribution is assured by three booster pumps equipped with variable frequency drives.

The hot water is generated in three hot water storage tanks of 3000 L each. RO (Reverse Osmosis) & UV (Ultraviolet) are used for water treatment, filtration & disinfection

The installed drainage system consists of four sets of Duplex Submersible Pumps,
PVC, Cast Iron & PPHT piping network. The kitchens are equipped with Stainless
Steel gratings Grade 316

Le Bristol Hotel
Date

December 30, 2015

Category

BMS, Electrical, HVAC, Plumbing